Ambition House is relevant community-project experience held within the CBS Contracting leadership team. CBS Fire & Fit Out also contributed directly as specialist subcontractor, delivering the internal drylining, tape and jointing, and passive fire-stopping package within the distinctive new Lawrence Weston facility.
Ambition House
Project Overview
Ambition Lawrence Weston commissioned Ambition House as a new facility serving the local community.
The building was designed as a recognisable local landmark, incorporating a leaning façade, green roof and distinctive external cladding. Large areas of glazing create light-filled spaces including a sports hall, meeting rooms and flexible multifunctional areas.
The wider scheme also included a new public square intended for gatherings, events and markets. The £2.2 million project was delivered over 36 weeks and completed in October 2023.
The main-contract delivery forms part of the relevant experience of the CBS Contracting leadership team. CBS Fire & Fit Out separately delivered the internal drylining, tape and jointing, and passive fire-stopping package.
Challenge / Requirements
The building needed to combine a strong architectural identity with flexible, practical community use.
Its structure and envelope incorporated several construction forms and materials, creating coordination requirements at foundations, steelwork, precast elements, brickwork, cladding, stonework and curtain walling.
The roof combined single-ply membrane, insulated cladding panels and a green-roof area.
Internally, exposed services, wet underfloor heating and acoustic treatment needed to be integrated without compromising the intended architectural finish.
Delivering the specialist internal package also required close coordination with the exposed services, acoustic measures and the quality expectations of a prominent community building intended for varied long-term use.
Solution / Approach
The construction programme coordinated the foundations, steel structure and precast elements before progressing into the mixed façade and roofing packages.
Interfaces between facing brickwork, alloy cladding, stonework and curtain walling were reviewed carefully because the building’s appearance and weather performance depended on these transitions being resolved consistently.
The different roof forms were sequenced around the developing envelope, with particular attention to drainage, weathering and the green-roof build-up.
Internally, wet underfloor heating was coordinated with the floor construction and room layouts. Exposed building services were treated as a visible part of the design, requiring careful routing and installation.
Ceiling-mounted acoustic absorbers supported the performance of the sports hall, meeting rooms and multifunctional spaces.
External works and the new public square were integrated into the overall programme, allowing the building and surrounding community space to be completed as one coherent facility.
Within the completed building, CBS Fire & Fit Out coordinated the drylining, tape and jointing, and passive fire-stopping works with the exposed services, room layouts and wider internal finishing programme.
Results / Outcome
Ambition House was completed in October 2023, providing Lawrence Weston with a distinctive and flexible community facility.
The completed building combines sporting, meeting and multifunctional spaces with a new public square for gatherings, markets and events.
The project evidences relevant community-construction experience within the CBS Contracting leadership team, while CBS Fire & Fit Out’s direct drylining, tape and jointing, and passive fire-stopping package demonstrates the Group’s specialist contribution to the completed facility.
The specialist package contributed directly to the fire safety, finish and functionality of the completed internal spaces used by the community.