CBS Fire & Fit Out was appointed to deliver two summer projects at UWE’s Frenchay Campus: fire-remediation works across 342 student rooms and the refurbishment of toilet facilities within Q Block, home to the Faculty of Environment and Technology. during the academic shutdown.
UWE Frenchay Campus
Project Overview
Lancer Scott Construction appointed CBS Fire & Fit Out to undertake two coordinated workstreams at the University of the West of England’s Frenchay Campus.
The first involved fire remediation within 342 student-accommodation rooms, including passive fire-protection works intended to enhance compartmentation and compliance.
The second covered the refurbishment of toilet blocks within Q Block, which accommodates UWE’s Faculty of Environment and Technology.
Both workstreams were planned around the summer academic period to reduce disruption and enable facilities to be returned for student and staff use. Together, they demonstrate CBS’s ability to deliver fire-safety and fit-out packages across a live education estate.
Challenge / Requirements
The principal challenge is the scale of the room-based programme and the limited delivery period available during the summer academic shutdown.
The fire-remediation works required consistent installation and inspection across 342 individual rooms, with clear records needed for each completed location.
The Q Block refurbishment added a separate fit-out workstream involving existing facilities, services, finishes and user requirements.
Both projects required careful planning of access, sequencing, materials, quality checks and handover so that the accommodation and teaching facilities can be returned to UWE in time for the new academic period.
Solution / Approach
CBS Fire & Fit Out developed a planned sequence for progressing through the student accommodation room by room.
Each work area is identified, accessed and inspected before the required passive fire-protection measures are installed. Quality checks and photographic records are completed systematically to provide a clear evidence trail across the 342-room programme.
Labour, materials and supervision are arranged to support consistent progress while avoiding excessive numbers of open work areas. Any variations in existing conditions are reported promptly so that the correct detail can be agreed before work continues.
Within Q Block, the toilet refurbishment is coordinated around strip-out, existing services, new finishes, fittings and reinstatement. Activities are sequenced to allow the specialist trades to operate efficiently within the available summer programme.
Regular coordination with Lancer Scott Construction supports progress monitoring, access planning and timely resolution of technical issues. Both workstreams are managed with particular emphasis on safe working, consistent quality and readiness for final inspection and handover.
Results / Outcome
The Q Block and student-campus workstreams were completed using Quelfire passive fire-protection systems where specified.
CBS completed the combined seven-week programme one week early, allowing the renewed toilet facilities and 342 student rooms to be handed back in advance of the new academic period.
The project strengthens CBS Fire & Fit Out’s education-sector portfolio and demonstrates capability in both high-volume fire remediation and targeted fit-out refurbishment within a fixed summer window.
Completion one week early also created additional time for final review, handover and preparations before students and staff returned to the campus.