CBS Fire & Fit Out was appointed to refurbish executive lounges at Ashton Gate Stadium in Bristol. The works included strip-out, internal partitioning, drylining and associated carpentry, helping transform premium hospitality spaces within one of the region’s leading operational sporting venues.

Business CBS Fire & Fit Out
Client Lancer Scott Construction
Location Ashton Road, Bristol, BS3 2EJ
Scope Executive-lounge refurbishment
Value £80,000
Status Completed
Completion Early August 2026

Project Overview

Lancer Scott Construction appointed CBS Fire & Fit Out to support the refurbishment and upgrade of executive hospitality lounges at Ashton Gate Stadium.

CBS’s scope included stripping out existing areas, forming new internal partitions, completing drylining and undertaking the carpentry associated with the lounge improvements.

The project focused on modernising customer-facing hospitality spaces while working within an established stadium environment. The quality of the completed finishes is particularly important because the areas form part of the premium guest experience.

Ashton Gate remains an operational sporting and events venue, making access, logistics and programme coordination important considerations throughout delivery.

The home-side hospitality areas were completed as premium customer-facing spaces within the wider stadium operation.

Challenge / Requirements

The works had to be completed within an operational stadium where sporting fixtures, events, hospitality activities and other contractors may affect access to the working areas.

The project required old finishes and partitions to be removed before the revised spaces can be formed. Strip-out had to be controlled so that surrounding completed areas and retained building elements are protected.

New partitions, drylining and carpentry then had to be coordinated with the hospitality layout, building services and final finishes. The programme had to support the stadium’s operational deadlines and provide sufficient time for inspection, snagging and handover.

Solution / Approach

CBS Fire & Fit Out established a coordinated sequence covering strip-out, setting out, partition construction, drylining and carpentry.

Existing areas were reviewed before strip-out so that retained elements could be identified and protected. Removed materials were managed in line with the site logistics and waste arrangements agreed with Lancer Scott Construction.

Following strip-out, the revised lounge layouts were set out and checked against the design information. Internal partitions and linings were coordinated with existing construction, service routes, doors and the subsequent finishing trades.

Carpentry works were integrated into the programme so that frames, trims, fittings and associated details could progress with the partition and drylining package.

The site team maintained regular communication with the main contractor to manage access, venue activities and programme requirements. Inspections were undertaken throughout the works to confirm setting out, quality and readiness for following trades.

Quality checks were incorporated at each stage so that the completed partitions, carpentry and finishes could progress efficiently into final snagging and handover.

Results / Outcome

CBS completed the home-side executive hospitality refurbishment in early August 2026.

The coordinated strip-out, partitioning, drylining and carpentry works renewed the premium hospitality areas while responding to the operational demands of a major sporting and events venue.

The project demonstrates CBS Fire & Fit Out’s ability to deliver a carefully managed, high-quality internal refurbishment within a fixed programme and an active stadium environment.

Completion ahead of the principal seasonal activity allowed the renewed lounges to return to operational use with the required finishes, layout and supporting construction details in place.