CBS Contracting acted as Principal Contractor for the construction of a new freezer-storage extension for J R Harding & Sons in Frome. The £580,000 project combined groundworks, traditional masonry, structural steel, composite cladding and close coordination of the specialist refrigeration installation. through completion.

Business CBS Contracting
Client J R Harding & Sons Ltd
Location Frome
Role Principal Contractor
Scope New freezer-storage extension and associated external works
Value £580,000
Status Completed

Project Overview

J R Harding & Sons Ltd appointed CBS Contracting to deliver a new freezer-storage extension at its Frome facility.

The project included groundworks and new hardstanding to receive specialist freezer plant, together with a traditional masonry extension supported by a structural steel frame. The external envelope incorporated metal composite cladding.

As Principal Contractor, CBS coordinated the complete construction programme and managed the interface with the specialist refrigeration installation. The £580,000 commission required civil, structural, façade and specialist plant activities to be brought together within one controlled delivery strategy.

The freezer-storage function made coordination with the specialist plant contractor a central part of the brief, rather than a secondary installation following the building works.

Challenge / Requirements

The primary requirement was to create a durable freezer-storage facility while coordinating conventional construction with specialist refrigeration plant.

Groundworks and hardstanding needed to achieve the correct levels, load capacity and interfaces for the plant installation. The masonry walls, steel frame and metal composite cladding then had to be sequenced around access and the developing envelope.

CBS also needed to maintain clear Principal Contractor control over lifting operations, specialist access, safety arrangements and the programme dependencies between construction and refrigeration works.

The finished facility also needed to provide a practical and maintainable interface between the new building fabric, hardstanding, freezer plant and day-to-day industrial use.

Solution / Approach

CBS Contracting developed an integrated programme covering groundworks, structure, envelope and specialist plant coordination.

The hardstanding and foundations were prepared to the required levels before erection of the structural steel frame. Planned crane operations were coordinated with the steelwork contractor and lifting team, including delivery sequencing, crane position, exclusion zones and safe installation arrangements.

The traditional masonry construction and metal composite cladding were then progressed around the structural frame to form the extension and weatherproof envelope.

As Principal Contractor, CBS coordinated the specialist refrigeration contractor, ensuring that access, plant interfaces and service requirements were considered alongside the main construction activities. Regular site coordination supported timely decisions and kept the separate work packages aligned.

This practical approach allowed general construction and specialist refrigeration works to progress as one coordinated project rather than as disconnected packages.

Quality, access and programme responsibilities were managed through CBS’s Principal Contractor role, giving the client one point of coordination across the conventional and specialist packages.

Results / Outcome

CBS completed the £580,000 extension, providing J R Harding & Sons with new purpose-built freezer-storage accommodation and external hardstanding for the associated plant.

The completed facility brought together the masonry extension, structural steel frame, metal composite cladding and specialist refrigeration installation under CBS’s Principal Contractor management.

The project demonstrates CBS Contracting’s ability to coordinate industrial construction, structural works, lifting operations and specialist process equipment through clear planning, site control and communication.

The coordinated approach provided a complete operational asset rather than a shell awaiting later adaptation, with the specialist plant requirements considered throughout the construction process.