CBS completed a comprehensive programme of passive fire-protection works at 66 East Street in Taunton for Lancer Scott Construction. The package included fire-resistant sealing to service penetrations and measures supporting the required compartmentation throughout the development. within the CAT B fit-out.
66 East Street
Project Overview
Lancer Scott Construction appointed CBS Fire & Fit Out to undertake passive fire-protection works at 66 East Street, Taunton.
The programme focused on service penetrations, fire-resistant sealing systems and the continuity of compartmentation throughout the development.
CBS worked across the relevant areas to identify penetrations requiring treatment, install the specified systems and complete the necessary inspections and quality records.
The project was delivered in coordination with the main contractor and other trades whose services passed through fire-rated walls, floors and compartments.
The CAT B fit-out covered a footprint of approximately 550 m². CBS’s passive fire-protection scope used Quelfire and Siniat systems.
Challenge / Requirements
Passive fire protection depends on the correct treatment of numerous individual interfaces and penetrations.
Services installed by different trades may vary in type, size and position, requiring each detail to be checked against an approved fire-stopping solution.
The works also had to coordinate with the construction programme so that penetrations remained accessible for inspection before walls, ceilings and finishes were closed.
Accurate identification, installation and recording were essential to demonstrate that the required compartmentation had been achieved.
The package included approximately 440 linear metres of column and beam encasement and 55 mechanical and electrical service penetrations, all requiring consistent installation and auditable inspection records.
Solution / Approach
CBS coordinated the works with Lancer Scott Construction and the relevant service trades.
Work areas and penetrations were identified and reviewed against the specified fire-stopping details. Suitable systems were selected in accordance with the approved design, manufacturer requirements and the type of surrounding construction.
Operatives installed the fire-resistant sealing and associated components, paying close attention to preparation, dimensions, backing materials, depth and finished condition.
Installations were inspected before becoming concealed. Photographic records and location information were compiled to support the project’s quality-assurance and handover requirements.
Where services or openings did not match an available standard detail, the issue was raised for technical clarification rather than being resolved through an unsupported site adjustment.
The approach combined trained installation, clear records and close coordination with following trades.
BM TRADA certification supported the installation and inspection process, while Quelfire and Siniat systems provided the specified solutions for the different encasement and penetration details.
Results / Outcome
CBS completed the eight-week passive fire-protection programme in February 2026 across a CAT B fit-out footprint of approximately 550 m².
The completed package included around 440 linear metres of column and beam encasement and treatment of 55 mechanical and electrical penetrations using Quelfire and Siniat systems.
BM TRADA certification supported the quality-assurance approach, providing clear evidence for the required compartmentation and fire-safety performance at handover.
The completed and recorded installations provided the main contractor with a structured evidence set for handover and supported the required fire strategy across the finished accommodation.