CBS delivered drylining, acoustic treatment and passive fire-stopping works at Douglas Bader House, RAF Fairford, for Raise Projects Ltd. The £250,000 specialist package required controlled delivery within a secure environment and careful coordination with the wider office refurbishment programme.
RAF Fairford
Project Overview
Raise Projects Ltd appointed CBS to undertake drylining and façade works at Douglas Bader House, RAF Fairford.
The £250,000 commission combined specialist internal construction, acoustic treatment and passive fire protection.
The secure and operational nature of the site required access, personnel, materials and deliveries to be managed in accordance with the site’s procedures.
CBS coordinated its activities with Raise Projects Ltd and the wider project team, progressing the external and internal packages through the agreed programme while maintaining appropriate safety, quality and security controls.
Douglas Bader House provides office accommodation for an RAF charity. CBS’s package included internal drylining, specialist acoustic panelling and attenuation, and passive fire stopping.
The works were delivered over a 16-week programme and completed in April 2026.
Challenge / Requirements
Working on a secure defence estate creates requirements beyond those of a conventional construction site.
Access approvals, deliveries, workforce information and permitted photography may all be subject to additional controls.
The construction work itself required coordination between façade elements, internal drylining, services and adjoining trades.
CBS needed to maintain progress while respecting site-security procedures and ensuring that materials, labour and work areas were available at the right time.
Quality evidence also needed to be managed without breaching photography or information restrictions.
Solution / Approach
CBS worked with Raise Projects Ltd to understand the site’s access, security and operational requirements before mobilising.
Workforce and delivery information was coordinated in advance, reducing the risk of avoidable delays at controlled access points.
The drylining and acoustic package was planned around the office layout, service routes, fire requirements and following finishes. Setting out and concealed construction were inspected before boardwork and completed finishes progressed.
Specialist acoustic panelling, attenuation and fire-stopping interfaces were coordinated with the wider fit-out and the developing mechanical and electrical installations.
Where normal photographic quality records were restricted, the team followed the agreed site procedures for inspection and evidence.
Regular communication with Raise Projects Ltd supported timely decisions and alignment with the overall programme.
Additional coordination was required as the mechanical and electrical systems changed during delivery. CBS reviewed the effects on partitions, acoustic treatments and fire-stopping details, then adjusted the sequence so the specialist package could continue without compromising the completed performance requirements.
Results / Outcome
CBS completed the 16-week package in April 2026, contributing to the successful handover of renewed office accommodation at Douglas Bader House.
The internal drylining, specialist acoustic panelling, attenuation and passive fire-stopping works were delivered despite multiple changes to the mechanical and electrical systems.
The project demonstrates CBS’s ability to respond to design change while maintaining disciplined planning, quality control and communication within a secure operational environment. Publication of the project has been approved.
Successful handover despite these changes demonstrates the team’s ability to adapt its specialist work packages while maintaining control of quality, access and programme.
The right project starts with the right conversation
If you have a project in development, a specialist package to deliver or an opportunity you believe would suit CBS Group, speak to our team. We will take the time to understand what is required and advise honestly on how we can help.