CBS delivered the SFS structure and internal fit-out package for new welfare, office and training facilities at Framatome’s Avonmouth operation. Delivered across two coordinated phases, the specialist works supported a technically focused manufacturing environment connected with the Hinkley Point development.

Business CBS Fire & Fit Out
Client Raise Projects Ltd
Location Unit 6 Portside Park, Kings Weston Lane, Avonmouth, Bristol, BS11 8AR
Scope SFS structure, floor structure and internal fit-out
Value £450,000 across two phases
Duration 16 weeks across two phases
Completion January 2024

Project Overview

Framatome specialises in the production and manufacture of components supporting the Hinkley Point development.

Raise Projects Ltd appointed CBS to deliver the lightweight steel-framing and internal fit-out works for new welfare, office and training facilities at Unit 6 Portside Park in Avonmouth.

The £450,000 package included the SFS structure, internal fit-out, passive fire protection and carpentry, coordinated with mechanical and electrical services.

The works were delivered over a 16-week programme and completed in January 2024, creating functional support spaces within an active industrial setting.

The completed floor area extends to approximately 320 m². CBS held engineering design responsibility for the SFS structure and floor structure.

Challenge / Requirements

The project required new welfare, office and training spaces to be formed within an industrial environment supporting technically sensitive manufacturing activities.

The lightweight framing needed to coordinate with the existing building, services and intended internal layouts.

Fire protection, service penetrations, carpentry and finishes also needed to be integrated with the SFS construction.

The 16-week programme required timely design coordination and procurement, while site activities needed to respect the operational and safety requirements of the wider Framatome facility.

CBS also held engineering design responsibility for the SFS and floor structures, requiring design information to be resolved in step with procurement and installation.

Solution / Approach

CBS coordinated the SFS and fit-out package as a complete internal-build sequence.

The framing layout was reviewed against the required offices, welfare spaces and training facilities. Interfaces with the existing structure, mechanical and electrical services, doors and internal finishes were identified before installation progressed.

The lightweight steel framing was installed to create the main internal structure. Drylining, passive fire protection and carpentry were then coordinated around the developed layouts and service requirements.

Particular attention was given to penetrations and junctions affecting the fire performance of completed partitions and linings. These areas were inspected before becoming concealed.

The project team worked closely with Raise Projects Ltd and the wider supply chain to manage design information, materials, access and programme dependencies.

Deliveries and installation activities were planned around the active industrial environment, maintaining separation between construction work and ongoing operations.

The final package comprised the SFS and floor structures, internal drylining, tape and jointing, and structural carpentry. CBS coordinated its engineering design responsibilities with the wider project information before fabrication and installation.

Results / Outcome

CBS completed both phases in January 2024, delivering approximately 320 m² of new welfare, office and training accommodation.

The SFS structure, floor structure, internal drylining, tape and jointing, passive fire protection and structural carpentry were completed on time and within budget.

The project demonstrates CBS Fire & Fit Out’s capability to combine engineering design responsibility with specialist structural and fit-out delivery in an active industrial environment. Raise Projects Ltd and Framatome have approved the project for publication.

Delivering the package within the agreed time and budget provided the client with the completed support facilities while maintaining continuity across both phases.