CBS was appointed to deliver a comprehensive façade-remediation programme at The Old Dairy in Plymouth. The works included replacement of the insulated-render façade, non-compliant fire stopping, metal cladding and flashings across the multi-storey accommodation building. while the student accommodation remained occupied.
The Old Dairy
Project Overview
Unite Facades Ltd appointed CBS to undertake fire-remediation works to the external envelope of The Old Dairy in Plymouth.
The £1.8 million scope included full removal and reinstatement of the insulated-render façade, replacement of non-compliant fire stopping, and full renewal of metal cladding and associated flashings.
The project required systematic removal of the existing façade build-up so that concealed interfaces could be inspected and remediated before new materials were installed.
The works are programmed for completion in October 2026 and are progressing to programme.
The project is being delivered around the ongoing use of the accommodation, requiring the sequencing of façade work to remain aligned with resident access and operational requirements.
Challenge / Requirements
The project involved coordinating extensive remediation across a multi-storey existing building while controlling access, temporary exposure and weather protection.
Several façade systems met at openings, floor zones and changes in material. These interfaces needed to be resolved carefully so that the completed envelope provided consistent fire-safety and weather performance.
The works also required management of scaffolding, deliveries, waste removal, storage and temporary protection within the available site area.
Concealed work needed to be inspected and recorded before new façade finishes were installed.
The student accommodation has remained occupied throughout, increasing the importance of safe access, careful sequencing and clear coordination around residents and building operations.
Solution / Approach
CBS developed a phased approach to opening, inspecting and reinstating the external envelope.
The existing insulated render, metal cladding and associated details were removed in controlled sections. This allowed the underlying construction and existing fire-stopping arrangements to be assessed without exposing unnecessarily large areas of the building.
Non-compliant fire stopping was removed and replaced before the approved insulated-render and metal-cladding systems were installed.
The site and technical teams coordinated junctions between different façade materials, window and door openings, flashings and fire-safety measures. Where existing conditions differed from the available information, findings were reported so that suitable details could be agreed.
Inspections and photographic records were completed at relevant stages, particularly before concealed fire-safety work was covered.
The phased sequence also supported more effective management of weather exposure, scaffolding access, deliveries and waste movements throughout the programme.
Regular coordination with Unite Facades Ltd supports decisions on site findings, resident interfaces and the progression of each work zone through inspection and reinstatement.
Results / Outcome
The project remains live and is progressing to programme, with completion planned for October 2026.
Once complete, The Old Dairy will have a renewed external envelope incorporating replacement insulated render, compliant fire stopping, metal cladding and new flashings.
The work is being delivered while the student accommodation remains occupied, demonstrating CBS’s ability to manage complex multi-storey façade remediation while maintaining control of resident interfaces, design coordination, logistics and quality records.
Progress to programme demonstrates the effectiveness of the phased delivery strategy and the coordination maintained between CBS, the client team and the occupied accommodation.
The right project starts with the right conversation
If you have a project in development, a specialist package to deliver or an opportunity you believe would suit CBS Group, speak to our team. We will take the time to understand what is required and advise honestly on how we can help.