CBS Fire & Fit Out completed an integrated programme of façade fire remediation and internal refurbishment at The Chocolate Box in Bournemouth. The appointment developed from specialist external-envelope works into a wider fit-out commission, reflecting the client’s confidence in CBS’s delivery, quality and collaborative approach.
The Chocolate Box
Project Overview
Lancer Scott Construction West appointed CBS to remediate fire-safety deficiencies within the façades of The Chocolate Box, a multi-storey accommodation development in Bournemouth.
The initial scope included removing non-compliant façade materials, installing approved fire-rated replacements and reinstating the external envelope.
Following progress on the remediation package, CBS was also appointed to undertake internal refurbishment and fit-out works. These included improvements to communal spaces, redecoration and associated internal upgrades.
The £1.6 million commission brought together compliance-led external works and improvements to the internal living environment, enabling CBS to retain project knowledge and coordinate the different packages through one delivery team.
The final internal scope included passive fire stopping, decorations and flooring. Mechanical and electrical works were not included within CBS’s commission.
Challenge / Requirements
The project required façade fire-safety deficiencies to be addressed within an existing accommodation building, with careful control of access, weather exposure, materials and disruption.
Removing the external materials exposed interfaces that needed to be inspected and resolved before compliant replacement systems could be installed.
The internal-refurbishment commission introduced additional requirements around communal spaces, existing finishes, services and building users. External and internal works needed to be coordinated so that activities did not conflict and the completed building achieved both safety and quality objectives.
Solution / Approach
CBS planned the façade-remediation package as a controlled sequence of access, removal, inspection, replacement and reinstatement.
Existing materials were removed systematically, allowing concealed construction and fire-safety interfaces to be inspected. Approved replacement systems and fire-rated materials were installed in accordance with the developed details.
The site team maintained regular communication with Lancer Scott Construction West, the design team and specialist supply chain. Quality inspections and photographic records were completed before remediated areas were closed.
As the appointment expanded, CBS incorporated the internal work packages into the wider programme. Communal-area refurbishment, redecoration and fit-out activities were coordinated with access requirements and the external-remediation sequence.
Retaining CBS across both workstreams reduced the need for a new contractor to learn the building and allowed established project knowledge, logistics and working relationships to support the internal refurbishment.
The result was an integrated rather than fragmented approach to the external and internal improvements.
Results / Outcome
CBS completed the façade remediation and internal fit-out in December 2025, providing safer, compliant and improved living spaces throughout the building.
The external package addressed identified façade deficiencies, while the internal works included passive fire stopping, decorations and flooring. Mechanical and electrical works remained outside CBS’s scope.
The extension of the commission demonstrates the client confidence established through delivery and provides a strong example of CBS coordinating external remediation and internal improvement within one building-wide programme.
The right project starts with the right conversation